Concept to Commissioning

  • Switch yard to Plant Automation.
  • Design the whole system or review the design as per customer guidelines
  • Generate specs to Float specs for procurement of material
  • Carry out technical discussion with supplier and align all quotes as per design requirement.
  • Give rating to supplier considering technical requirement and commercial terms and condition
  • Submit technical and commercial comparison to customer and briefing so that they shall do suitable selection of vendor
  • Monitoring the delivery timelines and if required visit for in process evaluation at vendor place
  • Attend Factory acceptance test (FAT), Clear the material for shipment
  • Line up erection and installation activity prior to receipt of material and after receipt
  • Pre check and trail runs of machinery and tuning of loops
  • Final commissioning and Site acceptance test - Ensure required quality of finished goods and full plant capacity achieved.
  • Measurement of plant efficiency and comparison with design value.
  • Final tuning of plant before hand over
  • Setting up MIS ( Management Information System)
  • Training to manpower for routine maintenance as well as regular checks at fixed intervals. Focus of increasing plant up time.
  • Special training to selected manpower to meet critical safety requirement of plant